Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

November 1, 2023

No Information to Display

1 Woodland Drive

Renovation

No Information to Display

$4,000,000.00

Public - State/Provincial

img_map_placeholder

1 Woodland Drive, Marienville, PA

Subscribe to View Full Documents

A. The contractual obligations for Electronic Security Systems work shall refer to shop drawing level systems design, supply, installation, wiring, repair, and maintenance of the upgraded security system, including labor and materials by the approved Contractor. 1. Provide conduits, conductors, and cables required for systems specified in Division 26 and Division 28. 2. Provide electrical work, electrical infrastructure, junction boxes, and special backboxes required for new equipment. Provide distribution of UPS power to security equipment and to each system specified in Division 26 and Division 28. 3. Provide the upgrade of Video Surveillance System (VSS) consisting of the following: a. Install new IP Video Surveillance Cameras as shown on Contract Drawings. Contractor shall coordinate exact installation locations with field conditions to avoid existing devices or disturbances in the areas of installation b. Provide all new Category 6 cabling, fiber optic cabling, conduit, pathways, infrastructure, and power supplies as required for a complete and function Video Surveillance System. c. Provide new Video Management System and camera licensing as manufactured by Bosch. 1) "The above item has been approved by the Department as a proprietary item. No other item will be accepted. Section 9.6 of the General Conditions to the Construction Contract does not apply to the above item". d. Provide new video storage, servers, and equipment for recording and playback of all new video surveillance cameras provided under this project. e. Provide new equipment racks, PoE network switches, patch panels, power supplies, circuits and Uninterruptable Power Supplies (UPS). f. Provide new video surveillance workstations and monitors as required and shown on the Contract Drawings. Questions during the bid stage shall be submitted via e-Builder under the Q&A Board tab in the Package's Invitation to Bid. All questions related to the proposed work or proposed Contract Documents must be submitted in e-Builder no later than close of business ten (10) days prior to the Bid Opening Date. DGS has scheduled a non-mandatory BDISBO SDB/VBE Goal Setting Information session on Thursday, June 1, 2023 at 10:00 AM. The meeting will be hosted on Microsoft Teams. Link: https://teams.microsoft.com/l/meetupjoin/19%3ameeting_YWRhYmRiOGItNzkyMC00MzllLWJmZGItMzYzNmIyOWM0ZGE0%40thread.v2/0context=%7b%22Tid %22%3a%22418e2841-0128-4dd5-9b6c-47fc5a9a1bde%22%2c%22Oid%22%3a%22a592b7c0-4847-4d85-a3e1- da3e4448837d%22%7d Meeting ID: 227 817 611 235 Passcode: paWQww Or call in (audio only) +1 267-332-8737,,503542185# United States, Philadelphia Phone Conference ID: 503 542 185#

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects