Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 17, 2024

No Information to Display

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Bozeman, MT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This Project Will Complete the Design and Construction of N 27th Ave Between Baxter Lane and Cattail St. The Project Includes Intersection Improvements at Both Baxter Lane and Cattail St. N 27th Ave Will Be Built to a City Standard With Curb and Gutter as Well as Sidewalk/pathways And Street Lighting. Alternatives Considered: Do Nothing. Advantages of Approval: Past Development of Large Commercial and Residential Projects Along N 27th Ave to the North Of This Project Have Created Increasing Demand for This Additional North South Connection. Additionally, This Project Will Enhance Opportunities for Additional Residential Development Along This Section of N 27th Ave. Sif152 This Project Will Also Add Connectivity to the Multimodal Network in This Area if the City. Additional Operating Costs: Added Mileage of Roadway Increases the Need for Additional Staff and Equipment for Sweeping, Plowing, Striping, and Sign and Street Light Maintenance. Added Mileage of Roads Increases the Need for Long Term Repair and Replacement. Increased Mileage of Sidewalks/pathways Adjacent To Un-annexed Properties or City Parks Require Sweeping, Plowing, and Long-term Replacement by The City. Changes From Last Cip: Combined Sif160,sif161, Sif154 Into Sif152 Project Appropriation in Other Years: Fy2025 FY-2024-2028 This project is included in the city's fy 2024-2028 Capital Improvement Program. As of August 1, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.