Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 21, 2023

August 21, 2023

May 1, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, South Haven, MI

Subscribe to View Full Documents

**As of August 3 2023, the project has not yet been awarded. A timeline for award has not yet been established.** The apparent low bidder for this project is Milbocker & Sons with a bid of $4,337,578.50. Estimated cost is $1.1million. The project includes the following approximate quantities of work: 1,000 feet of sewer trench excavation, adjusting sewer and repairing pile support connections, and backfilling. 600 feet of road reconstruction including pavement removal, grading, subbase, aggregate base, geogrid, hma paving, and concrete curb & gutter. Wastewater basin geomembrane liner replacement. Miscellaneous underground utility work and surface restoration. The Owner reserves the right to accept or reject any or all Bids. Your Bid will be required to be submitted under a condition of irrevocability for a period of sixty (60) days from the date of Bid opening. Bidders will be required to provide Bid security in the form of a certified check, bank money order, or a Bid bond in a sum no less than 5 percent of the Bid price, made payable to the City of South Haven. December 8, 2023 (on or before): Milestone 1: all underground and substantial completion of site work and road restoration up to aggregate base course April 17, 2024 (on or before) Substantial Completion May 1, 2024 (on or before) Completed and ready for final payment All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or electronically delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten five (5) business days prior to the date for opening of Bids may not be answered. Question Deadline 06/08/2023

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.