Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 9, 2023

July 3, 2023

October 31, 2023

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Dawson Creek, BC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City is seeking proposalsfrom qualified Proponentsfor the design, supply and installation of two (2) playground structures at two (2) City parks located within the municipal boundaries of Dawson Creek. As outlined in the attached Appendix A - Scope of Work, this RFP is for two (2) playground projects, which will be referred to in this RFP as Playground 1 - Mile Zero Park (formerly Rotary Lake) and Playground 2 - Kin Park. All playground structures will be installed on land owned by the City. As part of its annual playground renewal program, the City is embarking on improvements to two (2) playground structures. The sites for each of the playground structures will be in existing park areas with excellent access to each of the proposed locations. Each of the playgrounds projects have different themes and general requirements. Each playground project has a separate budget, which are not interchangeable. a) Playground 1 - Mile Zero Park is currently undergoing updates to various components of the Park and the City is with currently working with a local not-for-profit society, Mile Zero Park Society develop a new conceptual redevelopment plan for the park, which is intended to be completed in June 2023. A budget of $260,000 (not including taxes) has been assigned to this project. b) Playground 2 - Kin Park features a combination of manicured park space and natural areas and has a waterbody known as Dawson Creek that runs through it. A budget of $400,000 (not including taxes) has been assigned to this project. Documents can be obtained from www.bcbid.gov.bc.ca

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects