Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 21, 2023

September 12, 2023

June 8, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,105,104.00

Public - County

img_map_placeholder

Multiple Locations, Miami, FL

Subscribe to View Full Documents

**As of July 27, 2023, the project has not yet been awarded. The anticipated date for award is not yet determined. Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. Work includes but is not limited to the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, check valve installation, driveway restoration, grading, sodding, and miscellaneous roadway restoration including construction of concrete curb and gutters, sidewalks and guardrails, where needed in accordance with the construction plans and specifications. Location of work: A. This is a work order driven contract. The locations of work to be performed under the terms of this Contract have been tentatively listed as follows: 1. NE 90 Street and NE 10 Avenue Pipe Connection. 2. Snapper Creek Canal Outfall Retrofit on Snapper Creek Dr. from SW 100 Ave. to SW 97 Ct. 3. NE 26 Ct. from NE 191 St. to NE 190 Terr. 4. NW 12 Street and East NW of 133 Avenue. 5. NW 13 Street and North Miami Ave. B. The exact locations and limits of construction are shown on plans accompanying these Contract Documents. The County may update the work site list subsequent to the Award of this Contract by adding, deleting, or substituting with comparable sites. The combined total cost for all work authorized by the Work Order(s) shall not exceed the Contract Award amount. License Requirements: At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County. SBE-Con. Requirements: Yes Percentage: 100.00% DBE Participation: No Percentage: 0.00% CWP Requirements: No Percentage: 0.00% SBE-S Requirements No Percentage: 0.00% SBE-G Requirements No Percentage: 0.00% Liquidated Damages: $$ Per Day: $1,699.00 Anticipated Start Date: 9/12/2023 Calendar Days for Project Completion: 270 Performance & Payment Bond Required: Yes Bid Bond Required: Yes The County reserves the right to request additional information and/or contact listed persons pertaining to bidder's experience.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.