Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 27, 2023

August 29, 2023

December 14, 2023

220 Av. Vincent-D'Indy

Asbestos Abatement, Renovation

No Information to Display

$1,198,267.00

Public - State/Provincial

img_map_placeholder

220 Av. Vincent-D'Indy, Outremont, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1725916 Deadline for receipt of complaints: 2023-05-29 Université de Montréal is issuing a call for tenders to retain the services of a general contractor for asbestos removal and installation of new lighting fixtures to be carried out at the Claude Champagne Hall Pavilion located at its de la montagne campus. Summary of the project and the work to be carried out The lighting fixtures located on the mezzanine level of the Claude Champagne room are at the end of their life. The relamping of lighting fixtures is done from the ceiling space (confined space) that currently contains asbestos. The general contractor will be required to perform the following work: Remove asbestos from the entire ceiling and fireproofing again as specified by the professionals in the plans and specifications. Replace lighting fixtures as specified in professional plans and specifications The Claude champagne room will be completely closed for the duration of the work. The work must begin on August 15, 2023 and be completed no later than November 30, 2023. Schedule of work The Contractor undertakes to take all necessary measures to meet the schedule scheduled to begin work on or around 2023-08-15 allowing the issuance of the Certificate of Final Acceptance no later than: 2023-11-30; The work must be completed by November 15, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects