Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2023

September 8, 2023

January 7, 2025

Holt Blvd

Paving, Site Work

No Information to Display

$119,959,911.00

Public - County

img_map_placeholder

Holt Blvd, Ontario, CA

Subscribe to View Full Documents

The West Valley Connector Project will be a 100% zero-emission BRT system, and the second BRT route in San Bernardino County. The selected Contractor will be responsible for construction of the Project based on the final design plans provided by SBCTA. The Project (Phase 1 - Mainline Construction) is 19 miles and will upgrade a portion of existing Omnitrans Bus Route 61 which runs along Holt Boulevard, adding approximately 3.5 miles of center-running, dedicated bus-only lanes. There will be 21 stations in Phase 1 that will provide a much-improved transit connection to Ontario International Airport (ONT) and help build transit connectivity by linking ONT, two Metrolink lines (San Bernardino and Riverside) and multiple major activity centers along the route including Ontario Mills and Victoria Gardens. Headways will be 10 minutes in the peak commute period and 15 minutes off-peak, providing a high level of service to the community. Contractor will be responsible for building the Project improvements in accordance with the final design plans. At the time of issuance of this ITP, the Right of Way is partially certified. Information concerning ROW availability will be updated by an Addendum. It is anticipated that by the time NTP is issued, the ROW will be certified. Question Deadline 07/07/2023 at 5:00 PM PT

86 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.