Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 15, 2023

June 19, 2023

January 5, 2024

3935 Kincaid St

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

3935 Kincaid St, Burnaby, BC

Subscribe to View Full Documents

Burnaby General Hospital is one of the four major sites within the Fraser Health Authority region. There was no automation line installed at the Chemistry laboratory in this site before. Desired outcome of this project is to improve the efficiency of the Chemistry laboratory. The scope includes infrastructure changes necessary for the new chemistry, IA analyzers and automation line, to be installed by vendor. The goal is to renovate current facility infrastructure, including data, electrical, mechanical and architectural components, to prepare the space for the installation of automation line with new analyzers. The project should proceed without creating any downtime to the current lab operations and to minimize the impact to workflow and staff wellbeing. As the lab at Burnaby General Hospital operates 24 hours and 7 days a week, this project will be implemented in phases to minimize disruption to the operations. Scheduled must be allowance for analyzer installation by vendor in temporary or permanent locations and validation of the analyzers across phases as required and outlined herein. Furniture, fixtures and equipment will be reused where possible with new items as identified on the drawings. The estimated construction budget for this project is $500,000 and the estimated construction duration including allowance for analyzer moves, installation and validation by the vendor, is 6 months commencing at the beginning of June 2023. Anticipated Ready for Takeover date December 2023. Documents can be obtained from https://fraserhealth.bidsandtenders.ca/

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.