Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 23, 2023

July 24, 2023

July 23, 2024

1915 W Ash St

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

1915 W Ash St, Columbia, MO

Subscribe to View Full Documents

As of July 03,2023 this project has not yet been awarded. A timeline for award has not yet been established. The City of Columbia reserves the right to reject any or all proposals Questions must be submitted no later than 5:00 p.m. on June 14, 2023 All questions concerning the solicitation and specifications shall be submitted in writing via e-mail to the name below. You are encouraged to submit your questions via e-mail. Cale Turner Phone: 573-874-7375 E-mail: cale.turner@como.gov A. The Work is located at the West Ash Pump Station 1915 West Ash St., Columbia, MO 654203. B. The Work to be performed under this Contract includes constructing the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to, the following: 1. Replacement of existing 2,400 V electrical equipment with 480 V equipment. 2. Addition of emergency stand-by generator and automatic transfer switch. 3. New motors and variable frequency drives for the existing pumps. 4. Replace the motor control center and panel boards. 5. Convert existing chlorine feed and storage rooms to new electrical room. 6. Process pipe and valve modifications in the pump discharge piping. 7. Installation of new process pipe, meter, and valve in existing north discharge pipeline meter vault. 8. Construction of new pump station meter vault in the south discharge pipeline. 9. Painting/coating. 10. Instrumentation improvements. 11. Replacement of existing lighting fixtures with high-efficient LEDs. 12. HVAC improvements including demolition of existing boiler. 13. Architectural and structural improvements, including roof replacement.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.