Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 5, 2026

No Information to Display

11th St

Paving, Site Work

No Information to Display

$800,000.00

Public - City

img_map_placeholder

11th St, Sioux City, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Construction of 11th Street between Grandview Boulevard and Douglas Street. Several transportation plans for Sioux City have identified the need to connect 11th Street between Grandview Boulevard and Douglas Street. The 11th Street public right-of-way was previously vacated and leased to Bishop Heelan High School for a driveway and off-street parking. With the recent demolition of the former high school, we now have the opportunity to re-connect 11th Street. The 11th Street connection would provide an east/west transportation connection from Hamilton Boulevard to Lewis Boulevard. There are currently no agreements with the adjacent property owner to cost share for the construction of 11th Street. The City Council could choose to assess construction costs to the adjacent property owner. The adjacent property owner does have an existing underground pedestrian tunnel and off-street parking within the 11th Street corridor that will need to be removed and those costs will need to be shared with them. This project is included in the fy 2024-2028 Capital Improvement Program. As of May 23, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.