Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 26, 2026

No Information to Display

To Be Determined

Renovation

No Information to Display

$535,731.00

Public - City

img_map_placeholder

To Be Determined, Sioux City, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project would provide an alternate power supply to keep the Southbridge Regional Water Treatment Plant operational in the event of a power failure. This is in line with good asset management and complies with Iowa Department of Natural Resources recommendations. This project would also add a standby generator to the Riverside Collector Well. During the design phase of the Southbridge Regional Water Treatment Plant, a standby power generator was included in the preliminary design. With budget constraints and the addition of standby power at the Zenith Water Treatment Plant, City staff requested an exemption from Iowa Department of Natural Resources (IDNR). That exemption was granted until such time as the average day demand for City water exceeds the 14.5 million gallons a day average that the Zenith generator can provide. This project would provide for the installation of that generator, as recommended by IDNR. With the completion of the Zenith Pre-Treatment Project, the Riverside Collector Well will be placed into full water production. The Chris Larsen Park Collector Well and the Southbridge Collector Well both have standby power to keep our community in an adequate supply of water. This CIP covers the addition of Standby Power at the Riverside Collector Well. These two additions would provide for the ability to deliver an uninterrupted supply of water to our community even in an electrical outage. This project is identified as a Homeland Security Improvement and is an IDNR recommendation at this time. This project is included in the fy 2024-2028 Capital Improvement Program. As of May 23, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects