Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 15, 2024

No Information to Display

To Be Determined

New Construction, Site Work

No Information to Display

$354,998.00

Public - City

img_map_placeholder

To Be Determined, Sioux City, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Several locations had been discussed and or identified for the development of a City owned campground, including land near the Siouxland Expo Center. However, through a partnership with the Sioux City Railroad Museum, this is an opportunity to establish a campground facility within Siouxland on land near the museum. The proposed project site is approximately 16 acres and located along the Big Sioux River next to the Sioux City Railroad Museum. The proposed campground will be built to accommodate 52 motorhome and travel trailers (RV) campsites with the potential to serve between 316-474 campers. The pads would accommodate motorhomes, toyhaulers, campers, fifth-wheel trailers, and popup campers. Overnight tent camping would also be available on a 5-acre green space between the museum and riverbank. The Campground Development project would be developed in phases with the first phase land acquisition. The second phase grading, excavation, and installation of utilities. The third and final phase construction of the campground infrastructure to include roads, campsites, and a restroom/shower facility. This project is included in the fy 2024-2028 Capital Improvement Program. As of May 31, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.