Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 12, 2023

June 22, 2023

September 10, 2023

4401 University Dr

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

4401 University Dr, Fairfax, VA

Subscribe to View Full Documents

This project is generally described as renovations to the existing locker room spaces in the Field House Building including demolition as well as new construction, including interior partitions, ceilings, lighting, mechanical and electrical 1. Standard Bid Form must be completed and signed by contractor and submitted with bid submission 2. Any addendums issued during the bidding period must be executed and submitted with bid submission. 3. Contractor is required to submit a schedule of values, utilizing the HECO-12 Form with bid submission. Submission of SOV does not constitute approval. Refer to Attachment D 4. Contractor is required to submit a project schedule utilizing the project dates stated within this Invitation for Bid with bid submission. Submission of project schedule does not constitute approval. 5. Contractor is required to complete and submit Attachment E with bid submission. 6. Any bid in response to this solicitation shall be valid for sixty (60) calendar days. At the end of the sixty (60) calendar days the bid may be withdrawn at the written request of the bidder. If the bid is not withdrawn at that time, it remains in effect until an award is made or the solicitation is canceled. 7. If a Bid Bond is required, Contractor is required to complete, execute and submit the HECO-10.2 Bidders Questions must be submitted through Masons Construction Management Software Project, eBuilder on or before Tuesday, 30 May 2023. Responses to questions will be issued by Addendum. Owner reserves the right to respond to any questions received after the date as indicated in the Invitation for Bid.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.