Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 30, 2023

November 3, 2025

N Island Ave

Renovation

No Information to Display

$1,315,757.00

Public - City

img_map_placeholder

N Island Ave, Batavia, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Phase 1 of the Government Center Remodeling project includes the Police Lobby and the City Hall lobby on both first and second floors. The project will move Utility Billing and Reception/mailroom to the first floor, changing the Community Development counter to face the lobby, adding bathrooms to the first floor, adding office space to Community Development by removing a portion of the Police Department lobby, expanding Human Resorces into the former Utility Billing space, reducing the size of the meeting room on the second floor to add a small second floor lobby, add an office for Information Sytem staff, building a secure set of stairs off the Police Department lobby from floor one to floor three, removal of the existing stairs in the Police lobby, and upgrading the two entrance doors. The remodeling will incorporate safety measures for the building by restricting access to the second floor and by providing glass barriers for those serving the public. The project will also create two separate areas for police and the general public by creating two distinct entrances to the building and separating the interior. As of October 20, 2023, this project is included in the Capital Improvement Plan for FY2023-2027. Construction was estimated to start January 1, 2023 with completion November 3, 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.