Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 30, 2023

January 31, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, West Columbia, SC

Subscribe to View Full Documents

As of July 31,2023, proj wasn't awarded. No definite date for the rebid. All questions regarding this solicitation must be submitted online through the Lex2 eBid System by 5/19/2023 at 12PM EST. Lexington Two is seeking bids, to complete work on Walterboro Street, along Fulmer Middle School and at rear of Fulmer Middle School, shall include: removal of asphalt pavement to be used through reclamation for new asphalt pavement section installation of concrete curb/gutter; construction of concrete sidewalk, raised cross walk, new parking; and installation of storm drainage inlets/pipe. Direct Inquiries To: Bryan Gresham

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.