Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 23, 2024

February 23, 2027

IL-38

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

IL-38, Rochelle, IL

Our team is requesting plans for this project.

Subscribe to View Full Documents

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 7, 2023, at 10:00 AM at the Bureau of Operations Office in Springfield. Phase I/II engineering services are required for preparation of or amending an existing phase I design report and developing contract plans for the reconstruction of the South Bound Interstate Route 39 weigh station pavement north of IL 38. The proposed improvement includes pavement/ramp reconstruction, modify existing geometrics, weigh-in-motion (WIM) scale, multiplatform scale, locate signs, signals, utilities, striping and employee parking. Chapter 16 of the BDE manual has specifics for weigh station design and there are examples available for reference. This work will also include identifying locations for the scale house and possible 20’x100’ inspection building. That work will be completed through a separate contract with the Capital Development Board. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Highways (Road and Streets) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 41 - RFQ Engineering - I-39 SB Weigh Station N of IL 38, Phase I/ii Project, Ogle County, Bureau of Operations

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects