Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2023

November 27, 2023

November 11, 2024

8611 Watson St

Paving, Site Work

No Information to Display

$22,000,000.00

Public - City

img_map_placeholder

8611 Watson St, Cypress, CA

Subscribe to View Full Documents

DESCRIPTION OF WORK: Arnold Cypress Park is located at 8611 Watson Street in the city of Cypress and the 15-acre site is home to Cypress Girls Softball and various park activities. The rehabilitation of Arnold Cypress Park will include, but not be limited to, the following: demolition of the existing site (including perimeter fencing and walls, buildings and clear and grub), new site improvement including three lighted, synthetic turf softball fields, one natural grass softball field with infield mix, all associated ballfield amenities (including dugout and bullpens), separate batting cage and bullpen area, eight lighted pickleball courts, lighted basketball and volleyball hardcourts, exercise equipment cluster, perimeter walking trail, park amenities (including shade shelters, trash receptacles, drinking fountains, dog waste containers and tables/benches, etc.), children's play environment for 2-5 and 5-12 year olds with PIP rubber surfacing and shade shelter, prefabricated storage and restroom building, perimeter CMU block wall along south and western side of property, site utilities (including abandonment and new service connections, as required), and landscape and automatic irrigation improvements throughout. The Engineer's estimate for this project is $18 million to $22 million. COMPLETION OF WORK: The entire project shall be completed within two hundred sixty (260) working days (+90-day Landscape Maintenance) following written Notice to Proceed from the City. The park must be substantially complete and fully operational by October 1, 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions shall be submitted via email only to nmangkal@cypressca.org by 5PM Tuesday, September 19

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects