Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2023

July 17, 2023

December 31, 2023

206 Center St

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

206 Center St, Dushore, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of August 03,2023, project was awarded to Green Rhino Builders of Dallas, awarded amount is $ $24,500.00.** Clarification Deadline: 6/27/2023 4:00 PM The Commissioners have the right to reject any and all bids or parts thereof. Work will include removal and replacement of vinyl siding on two sides of the building along with gutters and downspouts on all sides, as well as the addition of facia and soffit on one side and the replacement of one door. All work shall be done in accordance with standard construction practices related to vinyl siding installation and as identified in the US Vinyl Siding Institute's Vinyl Siding Installation Manual. Remove and dispose of existing siding on the South and West sides of building. 2. Install 3/4" sheets of insulation between 1" thick batten strips 16" on center on the South and West sides of the building. 3. Side the South and West sides of the building with new vinyl siding to match existing siding on the North and East sides. 4. The West side of the building, also known as the back, will require new facia and soffit to match existing facia and soffit on the building. 5. The South side, also known as alley side, will require the replacement of an existing 36" exit only door. 6. The South (alley) side of the building will require new gutters and downspouts. 7. Existing gutters and downspouts on the North, East, and West sides of the building will be replaced to match the new gutters and downspouts installed on the South side. 8. Clean-up and disposal of all debris will be the responsibility of the contractor. CLARIFICATION DEADLINE 5/31/2023 4:00 PM

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.