Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 31, 2023

June 30, 2023

June 30, 2024

331 Blake St

Renovation, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

331 Blake St, Winnipeg, MB

Subscribe to View Full Documents

This Request for Proposals (the "RFP") is an invitation by the Government of Manitoba ("Manitoba"), as represented by the Department of Consumer Protection & Government Services, Capital Project Planning and Delivery ("CPPD") on behalf of the owner of the project, Manitoba Housing and Renewal Corporation ("Owner") to prospective proponents to submit proposals for Weston Park Boiler Mechanical Upgrades Phase 1, as further described in Section 1 of the RFP Particulars (Appendix 3) (the "Work"). CPPD requires the services of a General Contractor or a Mechanical Contractor to as a General Contractor for Boiler Mechanical Upgrades in 5 low-rise Multi-family buildings (Identified as Buildings D, E, F, G & W in the Contract Drawings), located at 330 & 331 Blake Street in Winnipeg, MB. The Scope of Work for this Phase includes, but is not limited to: Site work (natural gas service piping) upgrades for all 15 buildings on the site Removal of an indirect water-heater tied to the heating system and replacement with a gas fired water heater. (4 buildings) Adding a domestic hot water recirculation pump and line (5 buildings). Replacement of control valves and thermostats for the suites. (5 buildings) General Piping revisions to suit equipment installation (5 buildings) The work site locations (The suites in each building) will be fully occupied during construction. The contractor must maintain the heat in all the units during the heating season. CPPD is administering this RFP process. For the purposes of this procurement process, the "RFP Contact" will be: Contract Administrator: El Dela Cruz Email: cppdprocurement@gov.mb.ca Proponents and their representatives are not permitted to contact any employees, officers, agents, elected or appointed officials, or other representatives of Manitoba or CPPD other than the RFP Contact, concerning matters regarding this RFP. Failure to adhere to this rule may result in the disqualification of the proponent and the rejection of the proponents proposal. *Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.*

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects