Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

April 1, 2024

June 30, 2024

1954 County Home Rd

Paving, Site Work

No Information to Display

$145,000.00

Public - County

img_map_placeholder

1954 County Home Rd, Marion, IA

Subscribe to View Full Documents

This project includes: Pavement repairs, including but not limited to, removal and replacement of PCC pavement, sidewalks, curb and gutter at the Administration Building and Resource Recovery Building (RRB). This project also includes ADA curb ramp and storm sewer intake repairs. Each successful bidder will be required to furnish a corporate surety bond (Performance, Payment, and Maintenance Bond) in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by Cedar Rapids Linn County Solid Waste Agency and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless Cedar Rapids Linn County Solid Waste Agency from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two (2) years from and after acceptance of the improvement. All improvements shall be completed in accordance with the contract documents, including the plans, specifications, and contract, prepared by HDR Engineering Inc. Contractor shall fully complete the project in accordance with the schedule below. Should the contractor fail to complete the improvements in this timeframe, liquidated damages of $500.00 per calendar day will be assessed for work not completed within the designated contract term. The Engineer's estimate of probable cost is $145,000.00. The Cedar Rapids Linn County Solid Waste Agency does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the Owner.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.