Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 31, 2023

November 30, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Birmingham, AL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Birmingham Water Works (BWW), in Birmingham Alabama is seeking a qualified construction subcontractor for installation of Roller Compacted Concrete (RCC) as part of the proposed Lake Purdy Dam Improvements Project, hereinafter called the Project. The BWW is anticipated to issue Bids for the Project in October 2023. The site location is Lake Purdy Dam, Lake Purdy Dam Road, Birmingham, AL. We hereby, invite prospective RCC subcontractors for the Project (project reference number P.01034) to complete an application for special pre-approval in order to be listed as a pre-approved subcontractor for RCC portion of the work in the Contract Documents. Birmingham Water Works will receive applications for the pre-approval until May 31, 2023 and complete the pre-approval process by June 2023. The RCC portion of the project covered by this pre-approval is generally described as follows: Construction of an RCC buttress on the downstream face of the existing stone gravity dam consisting of over 11,000 cubic yards along the existing masonry spillway. This work includes proportioning, mixing, transporting, placing, compacting and curing of the RCC. RCC for this job is a mixture of aggregate and cementitious material blended with water to a damp consistency which permits hauling and spreading with earth moving equipment, and compaction with a vibratory roller with very little segregation of the aggregate. The RCC buttress will include cast-in-place concrete facing which will be formed and constructed in conjunction with each RCC lift. The project may involve the provision of an onsite RCC batch plant for mixing of the product. Pre-approval instructions, pre-approval application submission forms and reference information for the RCC portion of the Project are available for viewing electronically at website. For any questions about the site, please contact Dhiraj Parekh at Dhiraj.Parekh@arcadis.com.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects