Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

November 2, 2023

January 31, 2024

Multiple Locations

Site Work

No Information to Display

$169,525.00

Public - City

img_map_placeholder

Multiple Locations, Broken Arrow, OK

Subscribe to View Full Documents

TS23120 and 2453160 - SIGNALIZATION POLE IMPROVEMENT: This project consists of painting the existing traffic signal poles at the intersections of Kenosha Street and Aspen Avenue, Kenosha Street and Elm Place, Kenosha Street and Main Street, Kenosha Street and 9th Street, Kenosha Street and 23rd Street, Houston Street and Main Street, and Washington Street and Main Street, with add alternates for painting the existing traffic signal poles at the intersections of Washington Street and Elm Place, New Orleans Street and Aspen Avenue, and Florence Street and Aspen Avenue. Contract time for the project shall be Ninety (90) calendar days.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects