Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 17, 2023

June 15, 2023

August 14, 2023

Multiple Locations

Site Work

No Information to Display

$110,000.00

Public - County

img_map_placeholder

Multiple Locations, Huntingdon, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The work underthis project includesthe furnishing ofall labor, materials, and equipment required forthe performance of all reconstruction as indicated in the Contract Documents. The work essentially includes, but is not limited to: A. The excavation, removal and appropriate disposal of all debris, deleterious materials and all other materials to be removed and/or replaced herein under this Contract. All required excavation shall be included and made a part of each Bid Item to be constructed under this Contract. B. The furnishing and installation of PVC Storm Sewer Pipe, complete in place, including all required connections to the existing sewer system and including Bituminous Pavement Restoration. C. The furnishing and installation of 48" diameter Pre-Cast Concrete Manhole, complete in place D. The construction of Type "M" Storm Inlets, complete in place, including connection to the new Storm Sewer and the removal of existing Storm Inlets to be replaced herein under this Contract. E. The performance of ALL Post Construction CCTV in full accordance with the ALCOSAN Post Construction CCTV Requirements and the 3RWW Protocols. F. Compliance with all state and local public highway occupancy, roadway openings, pavement restoration, traffic control and any and all other applicable requirements. G. The placement ofBituminous Pavement including placement ofSuperpave 19.0mm Binder Material and Superpave 9.5mm Wearing Material H. The complete cleanup ofthe entire site ofwork. I. The completion of all other required site restoration, paving, landscaping and any other such related and required work. J. All such other related and required work as indicated on the Contract Drawings or contained elsewhere in the Contract Documents.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects