Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

March 16, 2024

Multiple Locations

Site Work

No Information to Display

$298,000.00

Public - City

img_map_placeholder

Multiple Locations, Shenandoah, PA

Subscribe to View Full Documents

The Project generally consists of the installation of 4 concrete conservation release weirs on the bypass streams of the Ringtown No. 6, Ringtown No. 5, and Raven Run No. 2 reservoirs as well as installation of 2 flowmeters on raw water transmission mains between Ringtown No. 6 to Ringtown No. 5 and Ringtown No. 5 to Raven Run No. 3 reservoirs. A certified check or bank draft, payable to the order of the Municipal Authority of the Borough of Shenandoah or a satisfactory Bid Bond executed by the Bidder and acceptable surety in the amount of 10 percent of the Total Bid shall be submitted with each bid. The SUCCESSFUL BIDDER will be required to furnish and pay for satisfactory Performance and Payment Bond, each in the amount of 100 percent of the Contract Price with a corporate surety approved by the Owner. PA Prevailing Wage Rates apply. The Owner reserves the right to reject any or all bids or to waive any informalities in the bidding. Question Deadline 08/14/2023 at 5:00 PM ET Clarification Deadline If a site visit is needed by the Contractor, please contact the MABS office via telephone at 570-462-1904 to notify the main office that you will be entering the property. The Contractor must provide the timeframe that they will be onsite for security purposes. The facilities themselves can be accessed by foot. The Owner and Engineer are not available for a site visit. Of Special note, Ringtown No. 5 Dam can be accessed from Reservoir Road for the purpose of the site visit, but vehicular traffic will be allowed through Pump House Lane during construction A certified check or bank draft, payable to the order of the Municipal Authority of the Borough of Shenandoah or a satisfactory Bid Bond executed by the Bidder and acceptable surety in the amount of 10 percent of the Total Bid shall be submitted with each bid.

93 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects