Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

April 1, 2024

August 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$3,600,000.00

Public - City

img_map_placeholder

Multiple Locations, Glendale, CA

Subscribe to View Full Documents

The scope of work generally includes the following: Selective removal and reconstruction of deteriorated pavement; selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, cross gutters, and alley aprons; modification of existing ramps to meet current ADA standards; application of crack sealing material; application of slurry sealing material; installing striping and pavement markings; adjustment of existing manholes, water valves, water meters, and other utilities to finished grade; and planting of trees. Bid Bond: 10% of Bid Amount Labor and Materials Bond: 100% of Contract Amount Performance Bond: 100% of Contract Amount. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Engineer's Estimate for this project is in the range of $ 3,400,000 to $ 3,600,000 The scope of work includes the following: Application of slurry seal- o West Elk Avenue between South Central Avenue and South Brand Boulevard o South Louise Street between East Windsor Road and East Maple Street o Magnolia Avenue between South Central Avenue and South Brand Boulevard o East Windsor Road between Glendale Avenue and Easterly Terminus o East Garfield Avenue between South Verdugo Road and Easterly Terminus o Roads End Street between Glendale Avenue and Colby Drive o Heminger Street between Glendale Avenue and Colby Drive o Crescent Drive between South Adams Street and Cornell Drive o Cornell Drive between Crescent Drive and South Adams Street o Columbia Drive between Cornell Drive and South Adams Street o Cambridge Drive between Cornell Drive and Dartmouth Drive o Dartmouth Drive between Cornell Drive and South Adams Street o Wellesley Drive between Dartmouth Drive and Columbia Drive o Vincent Way between South Adams Street and Easterly Terminus o Romulus Drive between Tyler Street and City Limit o Tyler Street between Green Street and East Chevy Chase Drive o Vista Superba Drive between Corona Drive and Southerly Terminus o Scofield Drive between South Adams Street and Princeton Drive o Yale Drive between South Adams Street and Scofield Drive o Princeton Drive between South Adams Street and Marion Drive o Berkeley Drive between South Adams Street and Princeton Drive o Stanford Drive between South Adams Street and Berkeley Drive o Vanderbilt Place between Stanford Drive and Marion Drive o Marion Drive between City Limit and Green Street o Marion Drive between East Palmer Drive and Romulus Drive o Oberlin Drive between Romulus Drive and Marion Drive o Scenic Drive between Marion Drive and Easterly Terminus o Corona Drive between Scenic Drive and Vista Superba Drive o East Palmer Drive between Oberlin Drive and City Limit o Park Avenue between South Adams Street and Marion Drive o Loma Crest Street between Marion Drive and Northerly Terminus Installation of new striping Our company is committed to working with you to help alleviate the impact of the construction on your daily activities. Every effort will be made to minimize any inconveniences to you. If you need to drive through the construction zone, please allow additional commuting time

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.