Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 15, 2023

July 25, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Madison, WI

Subscribe to View Full Documents

general the work consists of replacing thirteen electrical panels, replacement of the fire pump service disconnect, and circuit breakers require setting changes. Additionally, circuit breaker testing and equipment cleaning will be performed on switchgear, transfer switches, power distribution units (PDUs), and other identified service panels. New arc flash warning labels shall be attached to new and existing equipment. Coordination with utility for power outages is required. The project will take place on all levels of the building. Tommy G Thompson Center was constructed in 1996, has 133,016 square feet on eight floors and an underground parking ramp.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.