Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 13, 2023

December 21, 2023

No Information to Display

139 Bryan Blvd

Site Work

No Information to Display

$525,983.00

Public - City

img_map_placeholder

139 Bryan Blvd, Havelock, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of June 21, 2023, project is on hold. No definite date for the rebid. For questions in regards to the bid specifications, the City requires and only responds to questions submitted in writing and sent via email to fmatar@hazenandsawyer.com: and cc: Bids@havelocknc.us Questions must be received by 2:00 PM (EST) on Monday, June 5, 2023. If questions are received, the City will respond no later than 12:00 PM (EST) on Thursday, June 8, 2023. A. The Bryan Pump Station is located near 139 Bryan Blvd in Havelock, NC. The project will include abandoning the existing pump station and installing a new pump station as a replacement approximately 100' North of the current location. Work for this project will include the installation of the new 4 foot influent manhole, new duplex pump station housed in a 5 foot FRP manhole with its associated piping, valves, control panel(s), and electrical conduit and wiring. Bypass pumping will be required from the upstream manhole to the discharge manhole, shown on Figure 1, to allow for the installation of the new influent manhole and pump station. B. Figure 1 shows the general area and Sheet M1 describes the required pump station work. Figure 2 provides a detail of the influent manhole.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.