Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 24, 2023

January 8, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$100,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Quesnel, BC

Subscribe to View Full Documents

The proposed contract consists of installation of one 21.336 m steel girder superstructure with composite concrete deck, on steel pipe risers and pre-cast concrete footings on Garner FSR. Service will include the removal of the existing culverts and road fill. Service will include supply and placement of rip rap and completion of all new bridge approach road works within 20m of each end of bridge. Service will include reconstruction of the stream channel. Service will include completion of new road alignment. No bids received.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.