Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 8, 2023

August 1, 2023

December 3, 2023

1230 W Boone Ave

Renovation, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

1230 W Boone Ave, Spokane, WA

Subscribe to View Full Documents

PROJECT SUMMARY: This locally funded public works project consists of constructing transit center infrastructure and platforms to include traffic control, demolition, grading, concrete placement, asphalt paving, stormwater infrastructure, electrical, landscaping, and installation of signage. Estimated value: $600k - $700k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project shall generally consist of: 1. Obtain and pay for building and obstruction permits and fees as required for the scope of work. These permit fees will be reimbursable paid to the contractor by STA with no markup, refer to Section 002100 - Instruction Bidders -1.3b 2. All other permits are the responsibility of the contractor, refer to Section 007200.1 - General Conditions - 5.02 3. Perform and coordinate thorough public utility locates to complete the scope of work 4. Generate and submit a Submittal Register for review and approval by STA 5. Furnish, setup, and maintenance of approved traffic control 6. Demolition and grading per plans and specifications 7. Furnish and install bus stop sign posts per plans and specifications 8. Placement of concrete for roadway, sidewalks, and bus stops per plans and specifications 9. Remediation of adjacent irrigation and landscaping as required by the scope of work 10. All other work as shown and specified in the contract plans and specifications 11. Contractor responsible for ensuring the safety and security of project work sites as necessary during construction. 12. Contractor is responsible for any and all necessary erosion control measures required to complete the scope of work 13. Contractor responsible for reviewing all plans and specifications applicability to each bas bid item. Furnish & installation of platform amenities including shelters, markers, light poles, leaning rails, benches, and garbage bins Furnish and installation of bus stop flag PROJECT LOCATION South Hill Park & Ride, 2502 E 31st Ave, Spokane, WA, 99223 Completion- (150) DAYS

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.