Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

November 18, 2024

September 10, 2025

Morena Blvd

Paving, Renovation, Site Work

No Information to Display

$60,800,000.00

Public - City

img_map_placeholder

Morena Blvd, San Diego, CA

4

14

8

4

Subscribe to View Full Documents

Morena Pipeline: The Morena Pipeline project includes the removal and replacement of 16" cast iron water distribution main with polyvinyl chloride (PVC) (approx. 14,686 LF) and the installation of a 36" Welded Steel Pipe water transmission main (approx. 18,308 LF) and associated appurtenances. The Morena Pipeline move north along Morena Boulevard and Old Morena Boulevard from Napa Street to Balboa Avenue. Morena Boulevard Median: Construction of raised stamped concrete median and pedestrian fence. Restriping of existing edge marker and existing turn pocket on Morena Boulevard and restriping of new continental crosswalks. Morena Improv 3 (Sewer): Construction consists of the installation of approximately 778 LF of 15-inch sewer mains, including all associated laterals, manholes, trench restoration and all other work and appurtenances in accordance with these specifications and plans. Morena Improv 3A (Water): Construction consists of the installation of approximately 391 LF of 12-inch water mains, including all associated water services, fire hydrants, trench restoration, and all other work and appurtenances in accordance with these specifications and plans. Morena Pipeline (BL) This project will install bicycle facilities, sharrows, signage, flex post, and bike loops on the following location: W Morena Blvd between Morena Blvd (N) to Morena Blvd (S) Morena Blvd between W Morena Blvd and MTS Trolley Line Napa Street between Morena Blvd and Friars Rd. Estimated Bid Value $59,770,000.00 The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 40380-01-D through 40380-96-D, and 40380-140-D through 40380-158-D, for Morena Improv 3 (S) Plans numbered 0100380-01-D through 0100380-05-D, for Morena Improv 3A (W) Plans numbered 0100352-01-D through 0100352-05-D, for Morena Boulevard Median Plans numbered 39276-01-D through 39276-03-D, and Traffic Control for Morena Boulevard Median Plans numbered 39276-T01-D to 39276-T02-D, inclusive.

138 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.