Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 7, 2023

May 10, 2024

1500 W Bremer Ave

Addition, Demolition, Renovation, Site Work

No Information to Display

$1,849,000.00

Public - City

img_map_placeholder

1500 W Bremer Ave, Waverly, IA

Subscribe to View Full Documents

The scope of the project includes refinishing of various portions of an existing 21,200 SF single story, library building (with partial basement) and an addition of a 1,200 SF teen center. Refinishing includes, but is not limited to, installation of new carpeting & base trim, removal and partial replacement of wall vinyl, skim-coating of walls, re-painting, modifications to existing book shelving systems and end panels, new study rooms, children's tiered seating, baby garden/toddler play area, adult den with fire place, modifications to the drive-through pickup window, and removal and installation of new check-out desk, help desk, and youth desk, alongwith the removal of bulkheads and installation of new signage halos above service desks. The new teen center includes, but is not limited to, new built-in storage seating & gaming center millwork, overhead garage door, windows, HVAC equipment, electrical & telecommunications services, and lighting. For additional information contact Chris Wernimont at Studio MELEE by phone at (515) 460-5431 or by email at chris@studiomelee.com. 2. Architect will provide responses at Pre-bid conference to bidders questions and will publish via addenda. The intent is to award and authorize preparation of the City of Waverly's Construction Agreement for work to start on or after November 7, 2023, and is scheduled to be substantially complete on or before May 10, 2024. For additional information contact Sarah Meyer, Waverly Library Director, by phone at (319) 352-1223 or by email at smeyer@waverly.lib.ia.us -or- Chris Wernimont, AIA, Studio MELEE by phone at (515) 460-5431 or by email at chris@studiomelee.com. The right to reject any or all bids and to waive irregularities is reserved by the City of Waverly. Dated in Waverly, Iowa

52 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects