Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 27, 2023

August 8, 2023

March 5, 2024

324 Pine St

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

324 Pine St, Tarpon Springs, FL

Subscribe to View Full Documents

This project consists of intersection upgrades at Martin Luther King Drive and South Spring Boulevard to mitigate sea level rise and frequent flooding by raising the intersection elevation, installing new storm drains and stormwater check valves. The project also includes geometric intersection improvements to improve traffic flow, driver visibility, and pedestrian safety. The pay quantity shall consist of all materials and labor necessary to complete the survey and layout by the Contractor in connection with the construction of the project, performed to the satisfaction of the Engineer. The pay quantity for the work specified under this Section shall be one Lump Sum quantity. All questions or requests for additional information are required to be in writing e-mailed to purchasing@ctsfl.us. Questions must be submitted, in writing, not later than May 10, 2023. The Contractor shall take care while removing the bricks, as the bricks will be used to rebuild the street. The Contractor shall submit his plan for brick removal to the City for approval at least 14 calendar days prior to initiation of the work. The Contractor's method of brick removal shall minimize damage to the existing brick to the extent possible. Use of a front-end loader, bobcat bucket, or similar equipment will not be allowed unless approved by the engineer. The City of Tarpon Springs will supply pallets where the bricks must be stacked neatly to a maximum of 10 courses. The Contractor shall wrap the pallets of brick in plastic to secure the bricks prior to removal from the site. The Contractor will transport the bricks to and from the City's storage facility. No pallets of bricks or loose bricks are to be left on the site at any time the site is unattended.

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.