Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2023

August 17, 2023

December 21, 2023

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Fresno, CA

Subscribe to View Full Documents

1. Install (6) 330-foot runs of 2" aluminum conduit along with (4) 24X30X10 stainless steel enclosures at predetermined intervals throughout the run. The conduit run will start at the existing free standing stainless junction box JB-4P and end at the last 24X30X8 enclosure. This run is to be installed on the west end of aeration basins 9&10 and will primarily run on the end wall of the basin structure. 2. Replace failed power and control conductors previously identified from electrical vault EPB13A to final clarifiers 6,7,8, & 9 long and short collector drive local control panels. Question Deadline 06/21/2023 at 5:00 PM PT Online Q&A Yes Any questions concerning this bid should be referred to the designated Procurement Specialist, James Jackson James.Jackson2@fresno.gov and may be submitted electronically by utilizing the Questions and Answers field on Planet Bids, Explanation of Bid #1 Items: C-Side Aeration Basins 9&10 conduit and Enclosure Installation Scope of work: Install (6) 330 foot runs of 2" aluminum conduit along with (4) 24X30X10 stainless steel enclosures at predetermined intervals throughout the run. The conduit run will start at the existing free standing stainless junction box JB-4P and end at the last 24X30X8 enclosure. This run is to be installed on the west end of aeration basins 9&10 and will primarily run on the end wall of the basin structure. The conduit run will start with (6) 2" aluminum conduits leaving stainless junction box JB-4P and will drop off (2) conduits each at three of the 24X30X10 stainless steel enclosures. The City of Fresno will provide the following materials: 2000 - Feet of 2" aluminum Conduit. 200 - Feet of 1-1/2 X 1-1/2 Stainless Unistrut. 4 - 24X30X10 stainless steel enclosures. 28 - 2" Meyers hubs. 4 - 2" Malleable LR condulets with covers and gaskets. 250 - 2" Rigid stainless steel strut straps. 72 - 1/2 " spring nuts. 50 - 45-degree Unistrut brackets. 50 - 1/2 X 3-3/4 Stainless steel anchors. The contractor will be responsible for suppling any additional materials needed to complete the installation of this project. Explanation of Bid #2 Items: B-Side Final Clarifiers 6,7,8 & 9 Collector Drive Conductor Replacement Scope of work: Replace failed power and control conductors previously identified from electrical vault EPB13A to final clarifiers 6,7,8, & 9 long and short collector drive local control panels. o All failed conductors are to be removed from conduits, conduits are to be cleaned out, new conductors pulled in and terminated. o All new conductor splices in vault EPB13A shall be a watertight type of splice. o All new conductors must be identified on both ends with a durable form of wire marker. o The conductors to be replaced are circuit numbers, A2-408, A2-409, A2-410, A2-411, B2-408, B2-409, B2-410 & B2-411.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.