Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 18, 2023

June 19, 2023

December 11, 2023

2077 Airport Dr

Paving, Site Work

No Information to Display

$4,413,780.00

Public - State/Provincial

img_map_placeholder

2077 Airport Dr, Green Bay, WI

Subscribe to View Full Documents

Project No. GRB10132309925 Contract No. 1GRB1013 Replace Airfield Lighting and Signage, NAVAIDs and Airport Lighting Control and Monitoring System (ALCMS) Proposal guaranty: A bid security in the amount of 5% of the total amount of the bid is required for the contract. Each proposal must be accompanied by a bid bond, certificate of annual bid bond, a certified check, bank's draft, bank's check, or postal money order made payable to the Wisconsin Department of Transportation Secretary for 5% of the total amount bid. Any bid security, other than a E-verified bond or certificate of annual bid bond is provided, the department will require that the apparent two lowest bidders to mail or hand-deliver the original bond, certified check, bank draft, or money order to the Bureau of Aeronautics by close of business two business days following the close of bids and must be received by the Bureau of Aeronautics no later than 5 days from the posting of the bid results. Cost to bid: There are two options for bidders to submit bids: A cost of $35 per project, or a monthly subscription wherein the bidder is able to submit bids for all projects . system for $50 per month. Subscriptions can be turned on and off at any time by the registered user. Only the prime or general contractor submitting a bid are responsible for payment. Contract Completion Time: 175 Calendar Days Estimate of major quantities: 8 AWG 5kV Cable 138,000 LF; 2 Inch Electrical Conduit 132,000 LF; Counterpoise Ground Wire 80,000 LF; Remove Runway or Taxiway Lights 565 EA; Remove Guidance Signs 58 EA; LED Taxiway and Runway Lights 560 EA; Guidance Signs, 62 EA; Traffic Control 1 LS For further information, contact Kevin Sielaff, P.E. of Mead & Hunt, Inc. at 920-593-6849, or email kevin.sielaff@meadhunt.c

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects