Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 15, 2023

June 23, 2023

October 25, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,799,172.00

Public - City

img_map_placeholder

Multiple Locations, Senneville, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference Number: 1717997 Deadline for receipt of complaints: 2023-05-08 Village de Senneville is inviting tenders for Watermain Replacement at Avenue Elmwood and Avenue Pearson. The work covered by the plans and specifications consists mainly of the following: Avenue Elmwood Replacement of the 150 mm drinking water main on Ave. Elmwood with a pipe of the same diameter between Chemin de Senneville and Avenue Pacific over an approximate length of 345 metres; Construction of lateral vegetated knots for stormwater drainage; Rehabilitation of the pavement structure and paving of Avenue Elmwood and between Chemin de Senneville and Avenue Pacific; Rehabilitation of grounds and facilities. Avenue Pearson Replacement of the 150 mm water main on Avenue Pearson with a pipe of the same diameter, mainly located off-road, between Avenue Pacific and St. George's High School. Restoration of surfaces following the work according to plans. Possible start of work: The award of the contract to the lowest compliant bidder should be completed at the municipal council meeting on May 23, 2023. Consequently, the order to begin the work may be issued as soon as the mandate is granted. Duration of work: Following the written order of the Supervising Engineer to proceed with the execution of the Work, the Contractor has forty-five (45) consecutive business days for the complete execution of the Work scheduled for 2023. This period includes the complete completion of the work. It must therefore provide for the number of teams required (machinery, labour, equipment and subcontractors) to carry out this work within the prescribed time. For the paving of the second layer scheduled for 2024, the Contractor has two (2) consecutive business days for the complete completion of the work. In addition, all work on Pearson Avenue must be completed between June 23 and July 14, 2023, including grassing work. An exception is authorized for the installation of the temporary aqueduct that can be built from June 19.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects