Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 29, 2023

October 9, 2023

September 26, 2025

2255 Antioch Rd

Addition, Demolition, Renovation, Site Work

No Information to Display

$20,161,000.00

Public - County

img_map_placeholder

2255 Antioch Rd, Cumming, GA

Subscribe to View Full Documents

Engineers Estimate: $19,000,000 - $23,000,000 1) New 9 MGD Flocculation and Sedimentation Basin. 2) 3 New Membrane Trains and Associated Equipment (In Existing Tanks). 3) Raw Water System improvements to Include New Baffle for the Raw Water Tank, Modifications to the Flow Control Vaults, Modifications to the Raw Water Piping, and Removal of the Abandoned Venturi Flowmeter. 4) New Sludge Collection Systems in the Filter Backwash Equalization Basins and Membrane Backwash Equalization Basins. 5) Filter Gallery Enclosure. 6) Addition of a Sodium Hydroxide Chemical Storage Tank to the Existing Chemical Containment Area. 7) New 10 MGD, 700 HP finished water pump, with a variable frequency drive. All work to be Substantially Completed 670 calendar days from issuance of Notice to Proceed. Final Completion is to be within 730 calendar days from issuance of Notice to Proceed. Proposal Award will be made at a later date. Forsyth County reserves the right to reject any or all proposals. Antioch Water Treatment Plant Phase 3A Expansion SPK Proposal: KN-59107-ASK REV. E ALL QUESTIONS are to be directed to Greg Bridges, Procurement Agent III, Forsyth County Procurement Department, (Email GEBridges@forsythco.com). All questions are to be received not later than 12:00 p.m. on Friday, June 2, 2023. Responses to substantive questions will be provided to all firms who have requested Proposal information. *Ruby Collins Inc. requests sub-bidding be submitted to: estimating@ruby-collins.com no later than June 21, 2023, at 05:00 PM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Shortlist Confirmed.

47 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.