Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 25, 2023

June 27, 2023

July 31, 2023

Multiple Locations

Renovation

No Information to Display

$598,800.00

Public - City

img_map_placeholder

Multiple Locations, Fresno, CA

Subscribe to View Full Documents

A. The contractor shall construct street improvements as shown on the construction plans per the City of Fresno standard, including removal and construction of existing sidewalk, driveway, ramp, and pavement. B. The Contractor will pay for and coordinate with the city for the wet tie connections to existing water main and providing of new water services, new fire services, water meter as well as trench resurfacing. The Contractor shall also furnish and install the detector check valves and vault, remove and replace existing concrete improvements, trench resurfacing and striping. C. Sewer facilities shall consist of constructing new sewer services at the locations as shown on plan. Also included is the trench and resurfacing and striping. D. The Contractor shall construct a new storm drainage pipeline as shown on the plans per FMFCD standards including trench resurfacing and striping. E. The Contractor is responsible for all coordination and project scheduling With Pacific Gas and Electric Company, AT&T Telephone Company and other utility companies regarding their work of relocating and/or undergrounding their facilities within the street right of ways. Such responsibility shall include, but not necessarily be limited to: the Contractor establishing and maintaining communication with the utility companies regarding the Contractors schedule and that of the utility companies; the preparation of street and sidewalk subgrade so that the utility companies can trench for their underground facilities; the establishment of surveyed street curb grades and alignments for the utility companies so that they may accurately locate their facilities; and the possible requirement to schedule work around existing utilities poles until such time as the utility companies complete their relocation or installations. Such coordination may require the Contractor to schedule multiple move-ins of equipment and personnel so that his work can be accomplished, as required by the construction documents. The Architect has made a diligent attempt to provide the various utility companies with project plans of the work prior to bidding. It is the Owners responsibility to contract with the utility companies for the relocation work and to pay all costs to the utility companies that may be chargeable by the utility companies for their work. Prime Contractor must have a valid Class "B" Contractor's License. Bids shall be accompanied by a certified check, cashier's check, or a bidder's bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. Question Deadline 05/10/2023 at 5:00 PM PT

129 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.