Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

March 18, 2024

September 14, 2024

Multiple Locations

Site Work

No Information to Display

$830,000.00

Public - County

img_map_placeholder

Multiple Locations, Big Spring, TX

47

19

3

Subscribe to View Full Documents

CRMWD - Water Pipeline Cathodic Protection Phase Two Question Deadline 11/02/2023 at 4:00 PM CT The deadline to ask questions This Project includes the following Work: A. Restoration of existing mortar coated steel cylinder water pipeline electrical continuity. The work includes the excavation and installation of joint bond cables at identified high resistance pipeline segments. The project includes the Big Spring, Diversion, Lake J.B. Thomas, Ivie section III, and the Red Draw pipelines. The project also includes the Spence Pipeline listed as an Alternate Bid Item following the same scope of work. Refer to the Cathodic Protection Details Sheet JB-1 to JB-2 and specifications 13 47 14. Continuity testing for one interval of piping for Ivie section III between 880+84 and 892+34. Refer to the Notes Sheet, Note 24 and sheet 13 JB-3. B. Installation of: o A new impressed cathodic protection (CP) system for the Red Draw water pipeline. The Red Draw pipeline is approximately 1.52 miles in length and runs from the Red Draw Dam facility to the Beals Creek Pump Station. o Two (2) bonding test stations for the Big Spring Pipeline. o Forty-two (42) foreign pipeline test stations for the Ivie section III pipeline. Refer to the Cathodic Protection Details sheets CP-1 to CP-9 and specifications 13 47 13. The Owner's Budget for the Project is $3,700,000.

93 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects