Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 24, 2023

July 24, 2023

December 24, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$8,356,288.00

Public - City

img_map_placeholder

Multiple Locations, Glendale, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project was awarded to Toro Enterprises, Inc. in the amount of $8,356,287.95 . The estimate is in the range of $7,500,000 to $8,500,000. Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work included in the Bid is defined in accordance with Specification No. 3849 and Plan Nos. 1-3088, 1-3093, 1-3107, 3-1580, 3-1585, 4-638, 4-641, 49-257, 50-694, and 50-695. The work generally includes: Surface grinding and placement of ARHM; surface grinding and placement of ARHM over Asphalt Rubber Aggregate Membrane (ARAM); selective removal, repair, and reconstruction of damaged curbs and gutters sidewalks, driveways, cross gutters, alley aprons, and bus pads; modification and reconstruction of curb ramps to meet current ADA standards; adjustment of existing manholes and water meters to finished grade; removal and replacement of existing traffic striping and pavement markings; installation of new bicycle route (class III) with green shared roadway bicycle pavement markings (B-Type Sharrows); removal and replacement of sanitary sewer main line; removal and replacement of storm drain line; installation of storm drain line; construction of catch basins; construction of manhole structures; realignment of intersections; planting of new street trees; modification of existing traffic signals; installation of two drywells; as shown on the project plans and specifications, Standard Plans for Public Works Construction (SPPWC 2021 Edition), and the Standard Specifications for Public Works Construction (2021 Edition), including all supplements thereto issued prior to bid opening date *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Other Bidding Information: Number of Contract Working Days: 160 Working Days Amount of Liquidated Damages: $4,000 per Calendar Day Required Construction Staging: Four Phases, See Construction Staging Plan Intermediate Completion Milestones: Phase I must be completed by October 13, 2023 *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.