Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 16, 2023

June 15, 2023

No Information to Display

Pointview Rd

Paving, Site Work

No Information to Display

$180,742.00

Public - City

img_map_placeholder

Pointview Rd, Lake Milton, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Checks are to be made payable to Thomas Fok & Associates, Inc. Project includes partial depth asphalt removal and replacement in the most distressed locations (5%) and then a 2" asphalt pavement overlay following ODOT specifications. Approximate pavement dimensions are 2,338 ' long x 22 ' wide x 2" thick. Domestic Steel use requirements as specified in Section 153.011 of the Revised Code apply to this project. Copies of Section 153.011 of the Revised Code can be obtained from any of the offices of the Department of Administrative Services. Contractor and all Sub-contractors for labor performed and materials furnished in connection with the project involved. Milton Township reserves the right to reject any or all bids and waive any informalities in bidding. Bids of Corporations not chartered in Ohio must be accompanied by proper certification that such corporation is authorized to do business in Ohio. The successful bidder will be required to pay at least minimum wage rates pre-determined by the Secretary of Labor for the project work as required. The Schedule of Approved Wage Rates, as pre-determined by the Secretary of Labor is incorporated in the Contract Documents. This Contract is subject to the provisions of Executive Order 11246 of September 24, 1965, as pertains to an Affirmative Action Plan, and Governor Executive Order of January 27, 1972. A bidder/contractor will be deemed committed to the goals of Milton Township Plan Bid Conditions by submitting a properly signed bid. All bidders must fill in all blanks of the proposal in ink or typewritten. Entire 4/26/23, 12:03 PM. It - paste text and share with your friends Contract Book must be submitted intact with the bid. The successful low bidder will be required to comply with all Contract Requirements for Equal Employment Opportunities. Each bidder must insure that all employees and applicants for employment are not discriminated against because of race, color, religion, sex, or national origin. No bids may be withdrawn after the scheduled closing time for the receipt of bids for at least sixty (60) days. Engineer = s Construction Cost Estimate: $180,742.00

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.