Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 8, 2023

June 5, 2023

January 6, 2024

To Be Determined

Site Work

No Information to Display

$3,313,926.00

Public - County

img_map_placeholder

To Be Determined, Houston, TX

Subscribe to View Full Documents

Drainage Improvements within the High Meadows and Fairgreen Subdivision (2018) for Harris County Precinct 2 - UPIN 19101MF17C01 Questions Due Date: Apr 28th 2023, 12:00 PM CDT SUMMARY A. The High Meadows and Fairgreen Subdivision Drainage Improvements project site consists of subdivision drainage improvements located High Meadows and Fairgreen subdivisions, located west of John F. Kennedy Boulevard, east of Russ Drive, north of Aldine Mail Route Road and south of Lauder Road., in east Harris County; discharging into HCFCD Channel P138-01-01. Major work activities include approximately 4,790 linear feet of various reinforced concrete pipe sizes, inlets, manholes, junction boxes, culvert outfalls, clearing and grubbing, installation of flow regulators, and removal and reconstruction of existing driveways. B. The overall objective for this project is to increase storm sewer capacity and reduce the risk of flooding in the High Meadows and Fairgreen Subdivisions. The proposed improvement will outfall into a HCFCD maintained ditch P138- 01-01 that drain to Greens Bayou P138-00-00. C. The "Time of Completion" of this construction contract will be 215 working days (defined as consecutive calendar days). Contractor will be required to have two separate crews working simultaneously on the two drainage system (Charriton drainage and Debeney Drive) to meet the contract time.

54 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects