Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 28, 2023

October 30, 2023

December 15, 2024

Multiple Locations

Renovation

No Information to Display

$5,571,054.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Bismarck, ND

Subscribe to View Full Documents

Contract 2023-02 - Electrical upgrades The Project includes the following Work: Overview: The Scope of Work shall consist of construction tasks necessary to meet the plans and specifications for electrical upgrades to four North Dakota State Parks. The project will upgrade existing RV camper electrical pedestals and increase the available power per RV camper sites and address the associated impacts of the electrical service within the four parks. The scope of work outline is for the following North Dakota State Parks: 1. Fort Lincoln State Park Mandan, ND: a. Fort Abraham Lincoln State Park electrical scope will upgrade approximately (41) RV campsite s existing power pedestals from 30-amp to 50-amp (each) located in the South Loop and the Middle Loop. 2. Lake Metigoshe State Park Bottineau, ND: a. Lake Metigoshe State Park electrical scope will upgrade approximately (44) RV campsite s existing power pedestals from 30-amp to 50-amp (each) located in the Washegum Loop. 3. Lewis and Clark State Park Epping, ND: a. Lewis and Clark State Park electrical scope will upgrade approximately (12) RV campsite s existing power pedestals from 30-amp to 50-amp (each) located in the Pintail Loop. 4. Grahams Island State Park Devils Lake, ND a. Grahams Island State Park electrical scope will upgrade approximately (100) RV campsite s existing power pedestals from 30-amp to 50-amp (each) located in the Howard Loop and Ziebach Loop. The Project has an expected duration of 90 days and an expected completion date of November 15, 2024. It is very likely that all on-site construction will occur in the 2024 Calendar year. Each Bid must be accompanied by a separate envelope containing a copy of a current and valid North Dakota Contractor's License issued at least ten (10) days prior to Bid opening, and a Bidder's Bond in a sum equal to five percent (5%) of the full amount of the Bid, executed by the Bidder as Principal and by a Surety, conditioned that if the Principal s Bid is accepted and the Contract awarded to Principal, the Principal, within ten (10) days after notice of award, shall execute a Contract in accordance with the terms of the Bid and a Contractor s Bond as required by law and regulations and determinations of the North Dakota Parks & Recreation Department. Bidders shall submit proof of qualification to perform the Work as described in the Instructions to Bidders. Bid Result Schedule 1E STRATA CORP-$2,045,000 Schedule 3E TRIANGLE ELECTRIC-$196,054 Schedule 4E STRATA CORP-$3,330,000

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.