Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 2, 2023

June 1, 2023

No Information to Display

10000 Yankee St

Site Work

No Information to Display

$141,350.00

Public - City

img_map_placeholder

10000 Yankee St, Centerville, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Question Submission Deadline 04/28/2023 05:00 PM EDT The Consultant agrees to perform the services embodied in the Scope of Work attached hereto and hereinafter referred to as Exhibit A. Said Exhibit A is incorporated by reference as written hereinafter in full. The City of Centerville is soliciting proposals to provide all labor, equipment, and materials necessary to change-out sprinkler heads throughout the Heritage course (holes #1-#9) at Yankee Trace Golf Course, located at 10000 Yankee Street, Centerville, Ohio 45458. Description of Work: o Work will include sod removal and turf restoration. o Where trenching or excavation occurs on or around existing turf, the sod is to be cut, rolled, maintained, and replaced. Cut sod a minimum 18" wide and a minimum depth of 0.75". Ensure that all sod is replaced no more than forty- eight hours after it is lifted. Replace sod neatly and tightly, with strips being laid in the same place from which they were lifted. Any void between the replaced sod and the existing turf will be filled with topsoil or topdressing mix and reseeded with a seed mix provided by the Owner. Tapered edges must be cut off and inside edges squared before sod is re- laid over the trench, around sprinklers. o When digging out the old heads, keep the old heads - do not destroy sprinkler heads. Store dirt from holes on plywood, for no more than 48 hours. Install new heads in accordance with manufacturer's instructions. All excess wire to be taped to sprinkler heads. When backfilling the holes, tamp or compact the soil every 6" of lift to ensure no settling of the soil and heads. o The type of sprinkler head to be used is the Toro Infinity 55 Series Head, or the Rainbird 952 Sprinkler Head. Please specify in the Bid Express section of the submission which type of head your bid is including. o The equipment utilized for this project shall be suitable for driving on golf course turf, without destroying it, and anything damaged shall be restored.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects