Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 7, 2029

No Information to Display

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Leamington, ON

Our team is requesting plans for this project.

Subscribe to View Full Documents

Sewer Separation of the Northwest Quadrant of Leamington. Area 155, 156 & 157. Clark St W from Erie St N to Elliott St - Sewer separation (new storm & sanitary sewers); new roads & curbs; improved street lighting. Queens Ave from Selkirk Ave to Hazelton Ave - Sewer separation (new storm & sanitary sewers); new roads & curbs; improved street lighting. Selkirk Ave from Baird Ave to Queens Ave - Sewer separation (new storm & sanitary sewers); new roads & curbs; improved street lighting. Baird Ave from Selkirk Ave to Clark St W - Sewer separation (new storm & sanitary sewers); new roads & curbs; improved street lighting. Elliott St from Smith Ave to Municipal Trail - Sewer separation (new storm & sanitary sewers); new roads & curbs; improved street lighting, traffic calming & review PXO at trail. Smith St from Hodgins St to Elliott St - Sewer separation (new storm & sanitary sewers); new roads & curbs; improved street lighting, watermain replacement. Hodgins St from Smith St to MB# 24 Hodgins - Sewer separation (new storm & sanitary sewers); new roads & curbs; improved street lighting, watermain replacement. Area 158: Hodgins St, MB#24 Hodgins to the north end - Sewer separation (new storm & sanitary sewers); new roads & curbs (provisional); improved street lighting (provisional), watermain replacement (provisional). Wilkinson Dr, MB#434 to the municipal Trail - Sewer separation (new storm & sanitary sewers); new roads & curbs (provisional); improved street lighting (provisional), watermain replacement (provisional). Area 159: Elliott St, Municipal Trail to the north end - Sewer separation (new storm & sanitary sewers); new roads & curbs (provisional); improved street lighting (provisional), traffic calming (provisional). Wilkinson Dr from the Municipal Trail to MB#61 - Sewer separation (new storm & sanitary sewers); new roads & curbs (provisional); improved street lighting (provisional). Area 160: Queens Ave from Wilkinson Dr to Hazelton Ave - Sewer separation (new storm & sanitary sewers); new roads & curbs (provisional); improved street lighting (provisional). Wilkinson Dr from MB#61 to Erie St - Sewer separation (new storm & sanitary sewers); new roads & curbs (provisional); improved street lighting (provisional). Hazelton St from Erie St to Elliott St - Sewer separation (new storm & sanitary sewers); new roads & curbs (provisional); improved street lighting (provisional), review of PXO at trail (provisional). TIMELINE: RFP for engineering services to complete design has been awarded. Design is underway. Tender and construction are not anticipated prior to 2029. Coverage of this report is discontinued at this time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.