Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2023

April 1, 2024

October 31, 2024

SW Barnes Rd & SW Viewmont Dr

Site Work

No Information to Display

$697,000.00

Public - County

img_map_placeholder

SW Barnes Rd & SW Viewmont Dr, West Haven-Sylvan, OR

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Please note that Addendum 1 is available. The proposed work for the Project consists of furnishing required labor, equipment, and materials for construction of the following: 1. Approximately 1,000 linear feet (lf) of 12-inch, 700 lf of 8-inch, and 120 lf of 6-inch ductile iron restrained-joint water piping with ductile iron fittings and polyethylene encasement. 2. Install via horizontal directional drilling approximately 200 lf of owner-furnished 14-inch HDPE and reducer connections. 3. One fire hydrant including ductile iron fire hydrant leads with polyethylene encasement, abandonment of existing water mains, five water service replacements, testing and special inspection, associated surface & fence restoration, clean-up, traffic control, erosion control, and incidental related work as described in the Contract Documents. 4. Engineers Estimate is $650,000 – $800,000. Bids must be submitted on the prescribed forms and must be accompanied by a certified check or bid bond executed in favor of the Tualatin Valley Water District in an amount not less than ten (10) percent of the amount bid. The successful bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract as prescribed in the Contract Documents. The Owner reserves the right to reject all bids not in compliance with all prescribed public contracting procedures and requirements, including bidder responsibility under ORS 279C.375(3)(b), and may reject for good cause all bids upon the Owner’s finding that it is in the Owner’s or the public’s best interest to do so. The Owner reserves the right to waive informalities and to award a Contract to the qualified lowest responsive and responsible bidder. The successful Bidder must achieve Substantial Completion September 27, 2024 and Final Completion by October 31, 2024. Notice to Proceed is anticipated to be issued April 1, 2024.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details