Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 1, 2023

June 30, 2023

December 27, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Atlanta, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of August 9, 2023, the project has not been awarded as bids are currently under evaluation. A timeline for award has not been confirmed. As part of the Citys ongoing initiatives to meet the requirements of the Second Amended Consent Decree (SACD), the City has planned the Peachtree Creek Eastside- Project 2B to meet the 2-year design storm protection criteria in the First/Second Amended Decree issued to the City. The proposed improvements consist of replacement of capacity limited segments of the Peachtree Creek Eastside Sewer system. The Project is to be designed and constructed in two phases using the Progressive Design-Build delivery method as described in the Agreement. Question Deadline 05/04/2023 at 5:00 PM ET The Work to be performed under this Contract shall consist of furnishing all plants, tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents, which may be necessary for the complete and proper construction of the Work in good faith, shall be provided by the Contractor as though originally so indicated, at no increase in cost to the City

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.