Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 16, 2023

July 5, 2023

No Information to Display

3000 W Villa Maria Rd

New Construction, Paving, Site Work

No Information to Display

$1,800,000.00

Private

img_map_placeholder

Redacted Address, Bryan, TX

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

Subscribe to View Full Documents

The scope of work for the Brazos Christian School Bid Package No. 1 - PEMB will be for the following trades and will include but not limited to: PRE-ENGINEERED METAL BUILDING, PEMB ERECTION, PEMB INSULATION, and other related trades. There are two buildings in this bid package. Building one is approximately 6,246 sf. Addendum 1 has been issued. As of May 10,2023, the bid date has been extended. Although a firm timeline for constructi...

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.