Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 31, 2023

June 26, 2023

September 23, 2024

2003 NE Hostmark St

Addition, New Construction, Site Work

No Information to Display

$11,109,000.00

Public - County

img_map_placeholder

2003 NE Hostmark St, Poulsbo, WA

Subscribe to View Full Documents

The proposed project is a middle school building addition to replace 10 portable classrooms with new classrooms and support spaces. The project is an infill connecting the existing middle school building (Building 1) to the existing gymnasium and cafeteria building (Building 2). This project is an addition to existing Building 2 and will be separated from Building 1 with a 2-hour fire wall. Significant construction scope in existing Building 1 and existing Building 2 is limited to the connection to the new addition. The Project is more thoroughly described in the Specifications, Bidding Documents, and Contract Documents. The bids will include all Work pursuant to the Drawings, Specifications, and Addenda as may be issued prior to bid opening date. All questions must be submitted in writing to Bassetti Architects via email to: NKSDpoulsbo@bassettiarch.com Bid Date: a. Bid Opening: Wednesday, May 31, 2023, 2:00 pm, Local Time. b. Submission of HVAC, Plumbing, and Electrical Subs: Wednesday, May 31, 2023, 3:00 pm, Local Time. c. Submission of Structural Steel and Rebar Installation Subs: Friday, June 2, 2023, 2:00 pm, Local Time. Project Schedule 5.1 Friday, June 2, 2023: Intent to Award 5.2 Friday, June 9, 2023: “Limited” Notice to Proceed (Pre-Construction Activities) 5.3 Wednesday, June 14, 2023: Pre-Construction Meeting 5.4 Monday, June 26, 2023: “Full” Notice to Proceed (Construction Start and Mobilization) 5.5 Monday, August 26, 2024: Substantial Completion 5.6 Monday, September 23, 2024: Final Completion Bidder Questions 7.1 Questions should be submitted to Bassetti at NKSDPoulsbo@bassettiarch.com no later than 3:00 pm on Friday, May 19, 2023

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.