Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

October 3, 2023

October 1, 2024

6500 S MacArthur Blvd

Demolition, New Construction, Site Work

No Information to Display

$10,000,000.00

Public - Federal

img_map_placeholder

6500 S MacArthur Blvd, Oklahoma City, OK

Subscribe to View Full Documents

LOCATION OF WORK/PROJECTS: 012-AN2 is a 75,600 SF two story building located at Mike Monroney Aeronautical Center located at 6301 South MacArthur Boulevard, Oklahoma City, OK 73169. Magnitude of Construction: $5,000,000.00 to $10,000,000.00. Provide all labor and materials to renovate the 2nd Floor of the ANF2 Building - 012-AN2 per FAA construction plans and specifications provided by the FAA. Project consists of a Base Bid only and includes: 1. Complete demolition of all existing construction, finishes, HVAC, plumbing, and electrical as indicated in the contract drawings. A small section of existing raised access floor is to be removed to allow for the restroom expansion. All other raised access floor is to remain and be protected during construction. 2. Complete renovation of the AN2 2nd floor as indicated in the contract drawings. This work shall include, but not limited to: a. Reconfiguration of the 2nd floor walls, doors, and associated door hardware. b. Replace all existing 2nd floor ceilings and interior finishes. c. Install interior window treatments. d. Install FAA, IBC 2015, and ANSI A117.1 compliant signage. e. Install a new duct system layout to work with the reconfigured 2nd floor.f. Replace all existing 2nd floor VAVs and controls. g. Expand the existing restrooms and replace all existing restroom plumbing fixtures and finishes as indicated in the contract drawings. Overbuilt floor shall be installed at the restroom expansion. h. Drinking fountains shall be replaced with new combo drinking/bottle filler fountains. i. Modification of the fire suppression system shall be as required to coordinate with 2nd floor reconfiguration. Electronic & IT: 03 All questions regarding the project/specifications/plans must be received in writing to andre.casiano@faa.gov no later than 2:00 p.m. Central Time, Friday, July 28, 2023, to allow for responses to be provided prior to the due date for receipt of proposals. TO: Prospective offerors are recommended to attend pre-proposal conference to be held at 11:00 a.m. Central Time, Friday, July 21, 2023 via site visit at the Mike Monroney Aeronautical Center. The conference will be held for the purpose of site investigation. All questions will be sent via email to elizabeth.a.fikes@faa.gov regarding this Screening Information Request. Offerors are required to submit any questions they may have regarding this requirement in writing to the Contracting Officer by 9:00 a.m. Central Time, Friday, August 4, 2023. E-mail questions to elizabeth.a.fikes@faa.gov. Questions Continued ... *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects