Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 1, 2023

July 31, 2023

July 30, 2025

To Be Determined

Site Work

No Information to Display

$1,000,000.00

Public - County

img_map_placeholder

To Be Determined, St Clr Shores, MI

Subscribe to View Full Documents

Reference Number 0000317575 Question Deadline 05/25/2023 at 2:00 PM ET Questions are submitted online No Rehabilitation of an existing RTB/CSO outfall including sheeting, excavation, new outfall structure, and other appurtenances. General Requirements - Insurance Required - License Required - Local Service Required - Prevailing Wage Required Contact Information Steven Wagner 586-469-6134 steven.wagner@macombgov.org The Chapaton RTB Canal Rehabilitation Project includes the following major work items: - Site clearing, excavation, haul out, and installation of sheet pile to expand the Chapaton RTB Canal. - Installation of a 6-foot-high precast concrete screen wall. - Construction of a new canal gate structure with new control building and associated appurtenances. - Construction of a concrete bypass box culvert with slide gate and stop logs. - Furnish and installation of new weir gates, slide gates, valves, piping, and associated electrical and instrumentation. - Demolition of existing gate structure and control building. - New concrete screening structure at the Chapaton RTB outfall. - New flushing gates installed in the Chapaton RTB Basin easterly weir wall. - 9 Mile Road sewer separation and road replacement. - Site restoration and landscaping. CONTRACTOR shall submit plan to ENGINEER for approval, prior to beginning Work, for maintaining service of the existing gate structure and existing gate control building and Chapaton RTB and facilities in accordance with construction project constraints detailed in Part 3 - Execution - 3.01 Project Constraints. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Wade Trim Associates, Inc. - John Arvai -Senior Vice President- jarvai@wadetrim.com

85 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects